The complete model can be understood while going through below sections:
1. Introduction to DCF – How a simple model is structured in Investment Banks
2. DCF Assumptions – Key inputs required to flow in model and their setup and standard sources
3. P&L Assumption and Build – How at prelim level assumptions are taken and build up of only the key line items
4. Enterprise Value Calculation – Using two common methods of Perpetuity growth and Exit EBITDA Multiple
5. Sensitivity Analysis – Testing the robustness of your model with key assumptions.
6. Beta Calculations – How Beta is calculated for WACC
7. WACC Formation – Key assumption with inputs and WACC calculation