
SAP S/4HANA EWM Packaging Specifications Process, Author Mans Nagar WWW.LEARNWITHMANS.COM SAP EWM - Packaging Specifications Implementations, Splitting the W.T. into to W.T.´s to pick the different types of Packaging Materials with the different types of Products, Packaging Specifications and from the Outbound side whenever my Outbound Delivery Warehouse Task is going to be processed in the EWM system through the /N/SCWM/PRDO then automatically system will split the warehouse tasks into two warehouse tasks to pick 100 quantity from the Storage Type – CASES and By Mans Nagar another Warehouse Task to pick the 20 quantities from the Storage Type – EACHES, Automatically operations hand By Mans Nagar (By: Mans Nagar)led by the PPF Condition Records, Packaging Specifications, IPPE - Integrated Product & Processing Engineering, LEARN WITH MANS MANS NAGAR First step Product packaging with the Level-1, Elements, Elements Groups, Work Steps, Pack the Products in the BOX01 type CARTON BOXES, Packaging Materials type UOM (EA), Automatically HU creation at the time of Inbound delivery in the system, First Level and Second level Packing, first step using in this packaging specification process means level 1 for the packaging specifications to pack the product in the BOX01 – CARTON BOX and in this process Element Group, Elements (Tasks), Packaging Materials: BOX01, Packaging Materials type UOM is EA means quantities and work step type is MWW1 to pack the 6 quantities inside the BOX01 which is the CARTON BOXES, Packaging Specifications Group, first level packing means pack the materials only in the one BOX01 which is here the type of CARTON BOX, Second level is to pack these BOX01 or Materials into the Pallet. Level Set Contains (One or Two – One Box Packing only at Work Center, Level Set Two – Pallet Packing at work center Making HU01 ) – Level Type –Element Type, So I have here two Materials one is 5001005 which we pack in the BOX01 and only pack in one BOX01 and put-away Under Level One Packaging Specifications Second Materials just I have created which is 5001021 which is for Two Level Packaging Specifications to pack the Material in the Pallets and make one Full Handling Units for Put-away And we need to extend means migrate both the Products to the EWM system from ERP layer by using the t-code: /N/SCWM/MAT1 and then we can use these two Materials as Products in the EWM system with the Packaging Specifications, find full depth configurations in the books.