It was very insightful to speak with Akhilesh. He carries in depth knowledge of the industry and has unique insights on how to solve the challenges in construction space. His patience and eagerness to help others is truly inspiring. It was amazing to speak with him, exceeded all my expectations.
Project management | Project planning | Scheduling | MS project | Primavera P6 | Tilos | Google Studio| Power BI
1) MAHSR -C4 Package ( 235 KM viaduct and 4 Station, Surat main depot ,CCB, 4 approach Line, 350 M NATM tunnel)
2) Ahmedabad Metro (elevated viaduct of 4.8 KM)
3) Ahmedabad Metro (Twin tunnel of 4.1 KM and 2 underground station)
4) Bhopal Metro ( Elevated Viaduct of 6.225 KM )
5) Indore Metro ( Elevated Viaduct of 5.290 KM)
Specialties
**Project Management/Construction Management, Strategic Planning, CPM Scheduling, Budegting and Cost Control, Estimating, Labor Productivity Analysis.
**Project Controls- Scheduling, Earned Value Analysis, Planning, Estimating, Resource Management, Construction Accounting, Risk Management, Work Breakdown Structure (WBS),
**Project Engineering- Execution Supervision, Construction Sequencing,Design Co-ordination.